Process animation
Play the line in Animation Mode and watch parts move through the stations. After each run you get output, cycle time, utilization, idle time and transport distance.
In short
Play the line in Animation Mode and watch parts move through the stations. After each run you get output, cycle time, utilization, idle time and transport distance.
When to use
When this helps
Operators, engineers and managers should see the same flow before a change.
You want to show where parts wait and which stations stand idle.
You present a new line or a robot cell to management or a customer.
What it does
What you can do with it
Animation in Studio 3D
- Animation Mode plays the line in the 3D scene.
- Run statistics: units produced, effective cycle time, line utilization, idle share and transport distance in meters.
- Charts per run: output per line, hourly throughput, busy and idle time per object, idle time ranked by object and a trend across runs.
- Run reports to download as Excel (XLSX) or JSON.
Replay in Factory Sim
- A replay of every simulation run in a 2D plan or a 3D review, at speeds from 1× to 3600×.
- Operators, forklifts, hand trolleys and AGVs on their paths, and parts waiting in buffers.
- Station states in color: running, setup, waiting for input, blocked and idle.
- An event journal: click a stop, a blocked station or a finished unit and the replay jumps to that moment.
Getting started
How to start
- 1
Switch to Animation Mode
Open the scene, switch to Animation Mode and press play.
- 2
Pause and read the numbers
The statistics appear when you pause or stop. Compare them with what the floor produces.
- 3
Replay a simulation run
For a full shift with operators and vehicles, open Run visualization in Factory Sim.
What it does not do
- The animation shows the flow you modeled. It does not read live machine data.
- You cannot save the scene while the animation runs.
- Robot programs and robot paths are not animated.
Questions
Have a question about this topic?
Tell us what it is about. We will reply within one business day.
Proof and reading
Case studies and articles
Case studies on dbr77.com
Next step
See it on your plant
Talk to an expert. We will go through your layout, your process and the data you already have.