What the twin shows each decision-maker
The same model answers different questions for the board, operations, engineering, logistics, finance, sales and HR. Pick a role to see its questions and where to look in the product.
Choose a role
Eight roles, one model
Each page lists the typical problems of the role, what the twin shows and the product features to start with.
CEO / Owner
Check a large decision on one model of the plant before you sign it: a new line, an expansion or automation. The board sees the layout in 3D and the numbers from the simulation.
COO / Operations leader
See whether the plan fits the shifts and the machines before the week starts, and find the station that limits output.
CTO / IT & OT
Start the model from nominal times entered by hand or imported, without a large integration project. Integrations with ERP, MES and other systems are individual projects. The twin does not connect to your PLCs.
CFO / Finance
Compare investment options on the same simulated weeks before the money is committed, and see what each option changes in throughput, lead time and working capital.
Logistics & intralogistics
Model how material moves between stations: operators, forklifts, hand trolleys and AGVs, with their speeds, payloads and paths.
Industrial engineering
Build the line from routings, cycle and setup times and buffers, then test changes on the model instead of on the floor.
Sales & presales
Show the customer your solution in 3D on their layout, and leave them a showroom link with business cases and files.
HR, health & safety and training
Plan shifts on the model, and show new people the line in 3D before they stand on the floor.
Next step
Have a decision to test?
Describe your layout and the decision you are weighing. A DBR77 expert will show you how to test it on the digital twin, starting from the data you have.
Sign in or sign up at studio.dbr77.ai.
Frequently asked questions
- Which roles does DBR77 Digital Twin have pages for?
- Eight: CEO or owner, COO or operations leader, CTO for IT and OT, CFO or finance, logistics and intralogistics, industrial engineering, sales and presales, and HR, health and safety and training.
- Does each role need a separate tool?
- No. It is one model of the plant. The board looks at the layout in 3D and the investment variants, operations at the bottleneck and utilisation, logistics at transport and vehicles, and each role gets its own questions answered from the same data.
- What does IT and OT need to know before a rollout?
- The twin does not connect to PLCs, OPC UA or MQTT. A first model starts from the data you enter by hand or bring in by import (scope to be confirmed), and integration with DBR77 IRIS is an individual project. The model is a separate copy and nothing flows back to IRIS. Integrations with ERP, MES and other systems are individual projects.
- How does finance compare investment options?
- Each option is a variant compared on the same base model and plan: throughput, WIP, lead time and on-time delivery. The results export to CSV.