Case studies
Six projects where manufacturers and a supplier used DBR77 Digital Twin: a new production line, a plant expansion, a layout change, warehouse picking, an automation concept and a virtual showroom. The numbers come from the published case studies.
Projects
Six published projects
Each case study describes the plant, the task, the work done and the results.

Car lamp manufacturer, southern Poland
Production line design: 6% more output per day
+6%
daily output compared with a linear layout
3
layout variants compared

Car lamp manufacturer, southern Poland
Plant expansion: moving machines without stopping production
A plan that keeps production at the required level during the expansion.

Wooden furniture manufacturer
Layout optimization: 14% lower department costs
14%
lower department costs
PLN 300,000
less working capital

Ventilation and cooling equipment manufacturer, Mazovia, Poland
Material retrieval from the warehouse: up to 60% less time
up to 60%
less picking time
1,000 s, 550 s, 200 s
simulated time: no optimization, island algorithm, sorting algorithm

Plastic injection molding for household appliances, central Poland
Automation concept: an autonomous cart at the bottleneck
over 100%
higher efficiency at the bottleneck
90 s + 98 s
work and waiting at the first operator

Industrial automation and robotics
Virtual showroom for Fanuc
Customers reach product information faster, and the showroom attracts more potential buyers.