CFO / Finance
Compare investment options on the same simulated weeks before the money is committed, and see what each option changes in throughput, lead time and working capital.
Problems
What makes the decision hard today
A business case shows one number and no comparison.
Every option looks good on its own slide.
Savings promised by a project are hard to check afterwards.
What the twin shows
What you get from the model
Results you can check in the product, on your own data.
Options compared against the same base model and the same plan.
Throughput, WIP, lead time and on-time delivery for each option, side by side.
A published example: 14% lower department costs and PLN 300,000 less working capital after a layout change.
Where to look
Product features for this role
The parts of Studio 3D and Factory Sim this role uses most.
Variant runs
Run the same plan on each variant and compare throughput, WIP and lead time.
Variant comparison
The change against the base for throughput, lead time, WIP and on-time delivery.
Run report
The analysis report of each run with the bottleneck, utilisation, WIP and on-time delivery, as a document.
Case studies
Start with
Start with the features this decision needs, then add data as the model is used more often.
Next step
Talk to an expert about your layout, your process and the decision ahead of you. We will show it in the product.