COO / Operations leader
See whether the plan fits the shifts and the machines before the week starts, and find the station that limits output.
Problems
What makes the decision hard today
Output misses the plan and the reason changes from week to week.
Overtime and extra shifts are the default answer to every delay.
A fix on one station moves the problem to the next one.
What the twin shows
What you get from the model
Results you can check in the product, on your own data.
The real bottleneck, measured on your routings and shifts.
The effect of a bigger buffer, a shorter cycle or a parallel station, tested before you spend.
The share of orders finished on time in the simulated plan.
Where to look
Product features for this role
The parts of Studio 3D and Factory Sim this role uses most.
TOC suggestions
Factory Sim proposes the next change from the run: a buffer before the bottleneck, a shorter cycle or a parallel station.
Run replay
Watch the week on the plan, with waiting and blocked stations.
Utilisation by station
See how loaded each station and vehicle is, and which one holds the line back.
Case studies
Start with
Start with the features this decision needs, then add data as the model is used more often.
Next step
Talk to an expert about your layout, your process and the decision ahead of you. We will show it in the product.