By role

COO / Operations leader

See whether the plan fits the shifts and the machines before the week starts, and find the station that limits output.

Problems

What makes the decision hard today

Output misses the plan and the reason changes from week to week.

Overtime and extra shifts are the default answer to every delay.

A fix on one station moves the problem to the next one.

What the twin shows

What you get from the model

Results you can check in the product, on your own data.

The real bottleneck, measured on your routings and shifts.

The effect of a bigger buffer, a shorter cycle or a parallel station, tested before you spend.

The share of orders finished on time in the simulated plan.

Where to look

Product features for this role

The parts of Studio 3D and Factory Sim this role uses most.

TOC suggestions

Factory Sim proposes the next change from the run: a buffer before the bottleneck, a shorter cycle or a parallel station.

Run replay

Watch the week on the plan, with waiting and blocked stations.

Utilisation by station

See how loaded each station and vehicle is, and which one holds the line back.

Start with

Start with the features this decision needs, then add data as the model is used more often.

Simulation (Factory Sim)Process animationData & integrations

Next step

Talk to an expert about your layout, your process and the decision ahead of you. We will show it in the product.