Build the line from routings, cycle and setup times and buffers, then test changes on the model instead of on the floor.
Problems
What makes the decision hard today
Line balancing in Excel uses averages and misses waiting and blocking.
Changeovers and shared machines are left out because they are hard to calculate.
A layout idea needs a test before the move.
What the twin shows
What you get from the model
Results you can check in the product, on your own data.
Cycle and setup times entered per station, as nominal values you can adjust.
Working, setup, waiting, blocked and idle time for each station.
Layout and routing variants compared side by side.
Where to look
Product features for this role
The parts of Studio 3D and Factory Sim this role uses most.
Plan and shifts
The orders with due dates and the shift calendar that each run follows.
Station time composition
How each station splits its time between work, setup, waiting, blocking and idle.
Bottleneck and its cause
The station that limits the line, why, and the periods when it did.
Case studies
Start with
Start with the features this decision needs, then add data as the model is used more often.
Next step