Industrial engineering

Build the line from routings, cycle and setup times and buffers, then test changes on the model instead of on the floor.

Problems

What makes the decision hard today

Line balancing in Excel uses averages and misses waiting and blocking.

Changeovers and shared machines are left out because they are hard to calculate.

A layout idea needs a test before the move.

What the twin shows

What you get from the model

Results you can check in the product, on your own data.

Cycle and setup times entered per station, as nominal values you can adjust.

Working, setup, waiting, blocked and idle time for each station.

Layout and routing variants compared side by side.

Where to look

Product features for this role

The parts of Studio 3D and Factory Sim this role uses most.

Plan and shifts

The orders with due dates and the shift calendar that each run follows.

Station time composition

How each station splits its time between work, setup, waiting, blocking and idle.

Bottleneck and its cause

The station that limits the line, why, and the periods when it did.

Start with

Start with the features this decision needs, then add data as the model is used more often.

Simulation (Factory Sim)Factory layoutProcess animation