CEO / Owner
Check a large decision on one model of the plant before you sign it: a new line, an expansion or automation. The board sees the layout in 3D and the numbers from the simulation.
Problems
What makes the decision hard today
A large investment rests on a spreadsheet and a 2D drawing.
Each department brings its own numbers and nobody sees the whole flow.
An expansion has to happen while the plant keeps delivering.
What the twin shows
What you get from the model
Results you can check in the product, on your own data.
Investment options compared on the same measures: throughput, lead time, WIP and on-time delivery.
A layout the management team has walked through in 3D or VR before approval.
An order of changes tested before the first machine moves.
Where to look
Product features for this role
The parts of Studio 3D and Factory Sim this role uses most.
3D review of the plan
Walk the planned layout in Studio 3D or in VR with the board.
Variants side by side
Each investment option is a variant in Factory Sim, compared with the base on the same KPIs.
The bottleneck in one sentence
The run summary says what limits the line: a station, the vehicles, a buffer or a join.
Case studies
Start with
Start with the features this decision needs, then add data as the model is used more often.
Next step
Talk to an expert about your layout, your process and the decision ahead of you. We will show it in the product.